client1

about

SERVICE BULLETINS

Service Bulletins are available free of charge. Service Bulletins that have already been issued are available from the service bulletin library accessed below. New Service Bulletins are posted in the News section of this website and on ATP.

DOC TYPE DOC NUMBER DATE S269A S269B S269-C S269C-1 S269D S269D-A SUBJECT Download
DOC TYPE DOC NUMBER DATE S269A S269B S269-C S269C-1 S269D S269D-A SUBJECT Download
ASB/SB N-52.1 12/11/1968 X X X Rework - Tail Rotor Pedal Arm P/N 269A7336-5 Download
ASB/SB N-65 15/11/1968 X X X Kit Modification - Air Intake Assembly Re: Amphibious Float Landing Installation Download
ASB/SB N-11.1 29/11/1968 X X X Field Replacement - Auxiliary Fuel Boost Pump Download
ASB/SB N-55.1 09/12/1968 X X X Engine Lower Coupling Driveshaft P/N 269A5504-3 or Engine Lower Coupling Driveshaft P/N 269A5504-5 or 269A5504-1 Download
ASB/SB N-66 10/12/1968 X X X Blade Weight Installation - P/N 269B1145 Series Main Rotor Blades Download
ASB/SB N-60.1 X X X Balance Weight Assembly Installed - Low Tip Speed Tail Rotor Download
ASB/SB N-67 21/02/1969 X X X Inspection Main Rotor Swashplate Scissor Link Assemblies P/N 269A1335 and 269A1336 Download
ASB/SB N-37.2 10/03/1969 X X X Retirement - Bellcrank Assembly, Lateral Pitch Mixer Idler P/N 269A7506 Download
ASB/SB N-68 10/03/1969 X X X Control Cover - Bonding, Upper and Lower Download
ASB/SB N-71.1 06/10/1969 X X X Inspection - Tail Rotor Transmission Assembly P/N 269A6027 or 369A5400 Addendum dated - 10/27/1969. Download
ASB/SB N-69 08/10/1969 X X X Inspection, Corrosion Damage - Main Rotor Driveshaft P/N 269A5305-3 Download
ASB/SB N-70 08/10/1969 X X X Installation - Improved Fuel Injector Assembly Download
ASB/SB N-72 17/10/1969 X X X Periodic and Conditional Inspection - Main Rotor Mast Assembly P/N 269A2020 Download
ASB/SB N-73.1 24/03/1970 X X X Inspection - Idler Pulley Assembly, Axial Play Download
ASB/SB N-75.2 14/04/1970 X X X Inspection - Main Rotor Lead-lag and Flapping Hinge Bolts P/N HS1446-10-68 Download
ASB/SB N-78 31/07/1970 X X X Inspection - P/N HS1446-10-68 Bolt, Lead Lag and Flapping Hinge Download
ASB/SB N-79 04/09/1970 X X X Relocation - Oil Pressure Sender P/N 5654912 and Fuel Pressure sender P/N 5654913 Download
ASB/SB N-81 09/11/1970 X X X Modification - King KY-90A or KY-95 Transceiver Installation Download
ASB/SB N-83 01/02/1971 X X X Installation - Exhaust Heater Modification Kit No. M10065-1 Download
ASB/SB N-84 25/02/1971 X X X Retrofit Kit - Alternate Battery Location Download
ASB/SB N-76.2 22/03/1971 X X X Kit Installation - Main Rotor Thrust Bearing M10044 Download
ASB/SB N-89 16/04/1971 X X X Installation - Mounting Brackets Dual Head Alternator Download
ASB/SB N-91 09/06/1971 X X X Main Rotor Transmission Modification Kit No. M10062 Download
ASB/SB N-92 06/07/1971 X X X Relocation - Warning Indicator Light, Searchlight Control Handle Download
ASB/SB N-93 19/07/1971 X X X Inspection - Main Rotor Hub and Shaft Assemblies P/N 269A5305 and 269A5305-9 Download
ASB/SB N-94 26/07/1971 X X X Runout (TIR) Inspection - Main Rotor Thrust Bearing P/N 269A5050-73 Download
ASB/SB N-62.1 04/08/1971 X X X Kit - Floor Beam Reinforcement Download
ASB/SB N-90.1 07/09/1971 X X X Replacement - Idler Pulley Bearings, P/N 269A5050-62 Download
ASB/SB N-1.4 15/09/1971 X X X Field Modification - Idler Pulley Assembly P/N 269A5514 Download
ASB/SB N-95 15/09/1971 X X X 200-Hour Periodic Replacement - Idler Pulley Bearings Download
ASB/SB N-96 08/10/1971 X X X Modification - Center Back Cushion Assembly P/N 269A4092 Download
ASB/SB N-97 08/10/1971 X X X Modification - Cyclic Pitch Control Installation Download
ASB/SB N-88.1 10/11/1971 X X X 100 Hour Inspection - Engine Exhaust System Download
ASB/SB N-98 29/11/1971 X X X Inspection - Tail Rotor Control Stop P/N 269A7326 Download
ASB/SB N-99 15/12/1971 X X X Inspection - Latch, Belt Drive Clutch Handle, P/N 269A2210 Download
ASB/SB N-100 21/12/1971 X X X Repair of Tail Rotor Blades, P/N 269A6035 Series Download
ASB/SB N-77.1 14/02/1972 X X X Installation - Belt Drive Clutch Cable Guard Kit M10041 Download
ASB/SB N-74.1 16/02/1972 X X X Inspection - Main Rotor Mast Internal Corrosion Download
ASB/SB N-101 27/03/1972 X X X Shim Installation - Tail Rotor Hub at Fork (Teeter) Bearing; Replacement - Tail Rotor Fork Bearing Download
ASB/SB N-80.2 01/05/1972 X X X Static Source Relocation - Modification Kit No. M10059-5 Download
ASB/SB N-64.1 20/06/1972 X X X Upper Pulley Sleeve, Locknut and Spacer - Belt Drive Transmission Assembly Download
ASB/SB N-10.2 07/08/1972 X X X 25 Hour Inspection - Main Rotor Blade Download
ASB/SB N-102 X X X Inspection - Landing Gear Damper (poppet type) Assembly P/N 269A3150 Download
ASB/SB N-103 14/11/1972 X X X University Sound System Kit Installation P/N 269A4190-1 and 269A4190-3 Modification of MA-500 Amplifier Download
ASB/SB N-104 26/02/1973 X X X Manually Operated Searchlight Installation P/N 269A4333 Series Wire Replacement Alternator Switch to Circuit Breaker Download
ASB/SB N-106 17/03/1973 X X X Rework - Flotation Gear Installation Kit No. 269A4300-15 Download
ASB/SB N-107 06/04/1973 X X X Modification and Inspection - Belt Drive Idler Pulley Clutch Assembly P/N 269A5447 and 269A5447-3 Download
ASB/SB N-31.1 23/04/1973 X X X Field Installation and Modification - Dual Bolt, Tail Skid Mounting Hardware Download
ASB/SB N-108 21/05/1973 X X X Serialization - Tailboom Support Assembly P/N 269A2015-5 Download
ASB/SB N-3 04/05/1966 X X X Retrofit - Clutch Engagement Spring Assembly Guide Download
ASB/SB N-4 04/05/1966 X X X Modification - Fuel Injection System Bendix RSA5AB1 Download
ASB/SB N-5 18/05/1966 X X X Inspection - Belt Drive Transmission Strut P/N 5422 Download
ASB/SB N-6 16/06/1966 X X X Float Kit - Removable Skid Extension Download
ASB/SB N-8 15/07/1966 X X X Inspection - Belt Drive Idler Pulley Arm P/N 5506 Download
ASB/SB N-7 18/07/1966 X X X Modification - Engine Fuel Pump Drain Line Download
ASB/SB N-2.1 02/08/1966 X X X Modification - Fuel Injection Lines, Cylinders No. 1 and 3 Download
ASB/SB N-12 01/09/1966 X X X Field Modification - Belt Drive Idler Pulley Clutch Shaft P/N 5456 Download
ASB/SB N-13 29/09/1966 X X X Field Modification - Engine Cooling Scroll Download
ASB/SB N-15 04/11/1966 X X X Field Installation - Chip Detector Engine and Transmission Download
ASB/SB N-16.1 17/11/1966 X X X Field Modification - Tail Rotor Assembly Download
ASB/SB N-17 17/11/1966 X X X Field Modification - Fuel Injector System Rosette Fitting Download
ASB/SB N-18 01/12/1966 X X X Tape Application Area - Tail Rotor Blades Download
ASB/SB N-19 02/12/1966 X X X Field Modification - Induction System Air Filter Housing P/N 8143 Download
ASB/SB N-20 20/02/1967 X X X Field Installation - Spring Longitudinal Bungee Download
ASB/SB N-23 20/02/1967 X X X Field Replacement - Main Rotor Driveshaft Download
ASB/SB N-22 22/02/1967 X X X Reverse Installation - Collective Bungee Assembly Download
ASB/SB N-27 22/02/1967 X X X Kit Installation - Exhaust Heater Support Download
ASB/SB N-28 01/04/1967 X X X Removal AN960-416L Washer, Engine Cooling Shroud Side Panel Assembly Download
ASB/SB N-32 01/04/1967 X X X Rerouting - Alternator Wire Ties Download
ASB/SB N-14 27/06/1967 X X X Modification - Throttle Bellcrank and Control Cover Clearance Download
ASB/SB N-35 26/07/1967 X X X Inspection - P/N 269A5513 Bumper Plug, Lower Coupling Driveshaft Download
ASB/SB N-36 26/07/1967 X X X Inspection - Tail Rotor Driveshaft, Excessive End Play Download
ASB/SB N-34 07/08/1967 X X X Locknut Installation - Center Collective Pitch Stick Assembly P/N 269A9962 - Dual Control Download
ASB/SB N-26 22/08/1967 X X X Kit Installation - Low Speed Tail Rotor System Download
ASB/SB N-21 23/08/1967 X X X Bellcrank Installation Servo Fuel Injector Throttle Control Download
ASB/SB N-24 19/09/1967 X X X Main Rotor Blades, P/N 269B1145 Single Configuration Paint Download
ASB/SB N-25 01/11/1967 X X X Bracket Installation - Scroll Assembly Download
ASB/SB N-30 08/11/1967 X X X Exhaust Manifold Assembly Modification to Accommodate New Exhaust Adapter Flange Download
ASB/SB N-33.2 13/12/1967 X X X Kit Installation - Cabin Sealing - RE: Carbon Monoxide Ingestion Download
ASB/SB N-38 27/02/1968 X X X Inspection - Cable, Belt Drive Clutch Control Download
ASB/SB N-40 15/03/1968 X X X Tail Rotor Repair - Erosion, Blade Leading Edge Download
ASB/SB N-41 15/03/1968 X X X AC Engine Mounted Full - Flow Oil Filter - Installation Download
ASB/SB N-42 15/03/1968 X X X Installation - Jumper Wires Download
ASB/SB N-43 & ADD X1 28/03/1968 X X X Retrofit - Dual Clutch Spring Attachment Fitting P/N 269A5436-5 and 269A5436-7 Addendum dated - 04/23/1968 Download
ASB/SB N-44 29/03/1968 X X X Kit Installation - Utility Lights Download
ASB/SB N-45 29/03/1968 X X X Rework Electrical Components - Radio Noise Level Control Download
ASB/SB N-47 18/04/1968 X X X Inspection - Main Rotor Blade Flapping Hinge Bearing Download
ASB/SB N-48 02/05/1968 X X X Retrofit - Alternate Battery Location Download
ASB/SB N-49 08/05/1968 X X X Shim Installation - Bearing, Upper Pulley Assembly Download
ASB/SB N-50 08/05/1968 X X X Retrofit - Throttle, Governor Control System Download
ASB/SB N-53 24/06/1968 X X X Inspection - Tail Boom Center Attachment Fitting P/N 269A2324 Download
ASB/SB N-51 18/07/1968 X X X Kit Installation - Alternator Mounting Assembly - M10024 Download
ASB/SB N-54 26/07/1968 X X X Dashpot Installation - Throttle Control Modification Kit M10040 Download
ASB/SB N-39.2 14/08/1968 X X X Installation - Stiffener Canopy Slat Download
ASB/SB N-57 11/09/1968 X X X Support Clamp Installation - P/N 269A4869 Exhaust Heater Kit Download
ASB/SB N-58 12/09/1968 X X X Inspection - Tail Rotor Blade Assembly P/N 269A6124 Download
ASB/SB N-59 09/10/1968 X X X Inspection and Retirement, Main Rotor Thrust Bearing, P/N 269A5050-50 and -51 Inspection, Field Modification - Main Rotor Mast, Thrust Bearing Nut and Spacer Tube Download
ASB/SB N-61 30/10/1968 X X X Inspection - Tail Rotor Fork Bolts P/N 269A6235 Download
ASB/SB N-63 08/11/1968 X X X Inspection - Tail Rotor Driveshaft Damper Bearing Block P/N 269A5722 and 269A5722-3 Download
ASB/SB N-52.1 12/11/1968 X X X Rework - Tail Rotor Pedal Arm P/N 269A7336-5 Download
ASB/SB N-65 15/11/1968 X X X Kit Modification - Air Intake Assembly Re: Amphibious Float Landing Installation Download
ASB/SB N-11.1 29/11/1968 X X X Field Replacement - Auxiliary Fuel Boost Pump Download
ASB/SB N-55.1 09/12/1968 X X X Engine Lower Coupling Driveshaft P/N 269A5504-3 or Engine Lower Coupling Driveshaft P/N 269A5504-5 or 269A5504-1 Download
ASB/SB N-66 10/12/1968 X X X Blade Weight Installation - P/N 269B1145 Series Main Rotor Blades Download
ASB/SB N-60.1 20/02/1969 X X X Balance Weight Assembly Installed - Low Tip Speed Tail Rotor Download
ASB/SB N-67 21/02/1969 X X X Inspection Main Rotor Swashplate Scissor Link Assemblies P/N 269A1335 and 269A1336 Download
ASB/SB N-37.2 10/03/1969 X X X Retirement - Bellcrank Assembly, Lateral Pitch Mixer Idler P/N 269A7506 Download
ASB/SB N-68 10/03/1969 X X X Control Cover - Bonding, Upper and Lower Download
ASB/SB N-71.1 06/10/1969 X X X Inspection - Tail Rotor Transmission Assembly P/N 269A6027 or 369A5400 Addendum dated - 10/27/1969. Download
ASB/SB N-69 08/10/1969 X X X Inspection, Corrosion Damage - Main Rotor Driveshaft P/N 269A5305-3 Download
ASB/SB N-70 08/10/1969 X X X Installation - Improved Fuel Injector Assembly Download
ASB/SB N-72 17/10/1969 X X X Periodic and Conditional Inspection - Main Rotor Mast Assembly P/N 269A2020 Download
ASB/SB N-73.1 24/03/1970 X X X Inspection - Idler Pulley Assembly, Axial Play Download
ASB/SB N-75.2 14/04/1970 X X X Inspection - Main Rotor Lead-lag and Flapping Hinge Bolts P/N HS1446-10-68 Download
ASB/SB N-78 31/07/1970 X X X Inspection - P/N HS1446-10-68 Bolt, Lead Lag and Flapping Hinge Download
ASB/SB N-79 04/09/1970 X X X Relocation - Oil Pressure Sender P/N 5654912 and Fuel Pressure sender P/N 5654913 Download
ASB/SB N-81 09/11/1970 X X X Modification - King KY-90A or KY-95 Transceiver Installation Download
ASB/SB N-83 01/02/1971 X X X Installation - Exhaust Heater Modification Kit No. M10065-1 Download
ASB/SB N-84 25/02/1971 X X X Retrofit Kit - Alternate Battery Location Download
ASB/SB N-76.2 22/03/1971 X X X Kit Installation - Main Rotor Thrust Bearing M10044 Download
ASB/SB N-89 16/04/1971 X X X Installation - Mounting Brackets Dual Head Alternator Download
ASB/SB N-91 09/06/1971 X X X Main Rotor Transmission Modification Kit No. M10062 Download
ASB/SB N-92 06/07/1971 X X X Relocation - Warning Indicator Light, Searchlight Control Handle Download
ASB/SB N-93 19/07/1971 X X X Inspection - Main Rotor Hub and Shaft Assemblies P/N 269A5305 and 269A5305-9 Download
ASB/SB N-94 26/07/1971 X X X Runout (TIR) Inspection - Main Rotor Thrust Bearing P/N 269A5050-73 Download
ASB/SB N-62.1 04/08/1971 X X X Kit - Floor Beam Reinforcement Download
ASB/SB N-90.1 07/09/1971 X X X Replacement - Idler Pulley Bearings, P/N 269A5050-62 Download
ASB/SB N-1.4 15/09/1971 X X X Field Modification - Idler Pulley Assembly P/N 269A5514 Download
ASB/SB N-95 15/09/1971 X X X 200-Hour Periodic Replacement - Idler Pulley Bearings Download
ASB/SB N-96 08/10/1971 X X X Modification - Center Back Cushion Assembly P/N 269A4092 Download
ASB/SB N-97 08/10/1971 X X X Modification - Cyclic Pitch Control Installation Download
ASB/SB N-88.1 10/11/1971 X X X 100 Hour Inspection - Engine Exhaust System Download
ASB/SB N-98 29/11/1971 X X X Inspection - Tail Rotor Control Stop P/N 269A7326 Download
ASB/SB N-99 15/12/1971 X X X Inspection - Latch, Belt Drive Clutch Handle, P/N 269A2210 Download
ASB/SB N-100 21/12/1971 X X X Repair of Tail Rotor Blades, P/N 269A6035 Series Download
ASB/SB N-77.1 14/02/1972 X X X Installation - Belt Drive Clutch Cable Guard Kit M10041 Download
ASB/SB N-74.1 16/02/1972 X X X Inspection - Main Rotor Mast Internal Corrosion Download
ASB/SB N-101 27/03/1972 X X X Shim Installation - Tail Rotor Hub at Fork (Teeter) Bearing; Replacement - Tail Rotor Fork Bearing Download
ASB/SB N-80.2 01/05/1972 X X X Static Source Relocation - Modification Kit No. M10059-5 Download
ASB/SB N-64.1 20/06/1972 X X X Upper Pulley Sleeve, Locknut and Spacer - Belt Drive Transmission Assembly Download
ASB/SB N-10.2 07/08/1972 X X X 25 Hour Inspection - Main Rotor Blade Download
ASB/SB N-102 23/10/1972 X X X Inspection - Landing Gear Damper (poppet type) Assembly P/N 269A3150 Download
ASB/SB N-103 14/11/1972 X X X University Sound System Kit Installation P/N 269A4190-1 and 269A4190-3 Modification of MA-500 Amplifier Download
ASB/SB N-104 26/02/1973 X X X Manually Operated Searchlight Installation P/N 269A4333 Series Wire Replacement Alternator Switch to Circuit Breaker Download
ASB/SB N-106 17/03/1973 X X X Rework - Flotation Gear Installation Kit No. 269A4300-15 Download
ASB/SB N-107 06/04/1973 X X X Modification and Inspection - Belt Drive Idler Pulley Clutch Assembly P/N 269A5447 and 269A5447-3 Download
ASB/SB N-31.1 23/04/1973 X X X Field Installation and Modification - Dual Bolt, Tail Skid Mounting Hardware Download
ASB/SB N-108 21/05/1973 X X X Serialization - Tailboom Support Assembly P/N 269A2015-5 Download
ASB/SB N-110 24/09/1973 X X X Configuration Modification - 2050 Lb. Gross Weight Conversion Kit No. M10078 Download
ASB/SB N-113 03/03/1974 X X X Grease Quantity Requirements - Belt Drive Transmission Lower Pulley Bearing P/N 269A5050-507 Download
ASB/SB N-118 20/05/1974 X X X Corrosion Prevention/Inspection - Main Rotor Blade, P/N 269A1165 Blade Tip Weight Area and Tip Cap Download
ASB/SB N-119 23/05/1974 X X X Inspection - Replacement Main Rotor Blade Root Fitting Bolts; Main Rotor Blade Damper Bolts Download
ASB/SB N-120 29/07/1974 X X X Wiring Modification - Integrated Dual Communication Console (ATI) Download
ASB/SB N-122 04/12/1974 X X X Inspection - Impeller Bolt Installation Download
ASB/SB N-123 04/12/1974 X X X Inspection and Rework of Main Transmission Strut Assembly P/N 269A5015 Download
ASB/SB N-125 02/01/1975 X X X Static System - Line Restrictor and Drain Fitting Modification Kit P/N M10094 and M10093-3 Download
ASB/SB N-126 24/02/1975 X X X Inspection/Replacement Clutch Actuator Retaining Screws Download
ASB/SB N-86 26/02/1975 X X X Desensitized Throttle Modification Kit No. M10061 Download
ASB/SB N-127 05/03/1975 X X X Reinforcement and Field Repair Canopy Slat P/N 269A2297 or 296A2297-7 Download
ASB/SB N-128 25/03/1975 X X X Replacement of Plug P/N 23425-166 in Pinion Assembly P/N 269A5103 and -9 in Main Rotor Gear Drive Assemblies P/N 269A5175, -3 and -5 with Modification Kit P/N M10104; Securing of P/N 269A5050-1 or -20 Roller Bearing Download
ASB/SB N-87.2 25/03/1975 X X X Installation - Pitch Control Links, Low Tip Speed Tail Rotor Assembly (Kit No. M10067) Download
ASB/SB N-129 31/03/1975 X X X Inspection/Replacement Searchlight Mount Bolts Download
ASB/SB N-131 11/08/1975 X X X Inspection and Possible Replacement - Throttle Gear P/N 269A7223; Pilot and Copilot's Collective Pitch Sticks Download
ASB/SB N-130 28/08/1975 X X X Inspection - Fiberglass Tail Rotor Blades P/N 269A6124, -9, 269A6035, -9, -17, -19, -M, 269ASK15 and 269-6100 Download
ASB/SB N-115.1 03/10/1975 X X X Rework of Engine Mounting Hangar Assemblies P/N 269A8617 and 269A8618 to Eliminate Possible Engine Crankcase to Hangar Assembly Interference Download
ASB/SB N-124-1 03/10/1975 X X X Inspection - Main Rotor Mast; Left and Right Mast Support Tubes; and Replacement of all Attaching Hardware Download
ASB/SB N-132 07/11/1975 X X X Inspection - Horizontal Stabilizers Forward Boom Attach Fitting P/N 269A2518-3 Download
ASB/SB N-133 07/11/1975 X X X Installation of Engine Exhaust Seals P/N 269A8255 Download
ASB/SB N-136 01/03/1976 X X X Longitudinal Cyclic Trim Assembly - Installation of Limit Switch Download
ASB/SB N-112.1 26/04/1976 X X X Wiring Modification - Auxiliary Fuel Pump P/N 269A8311-1 and 269A8303-5 Download
ASB/SB N-138 30/04/1976 X X X Inspection - Lateral Cyclic Trim Control Assembly P/N 269A7316-3, -5, -7, -9 or -11 Download
ASB/SB N-139 20/05/1976 X X X Modification - Left Hand Front Engine Cooling Shroud Panel Assembly P/N 269A8508-15 or -25 and Engine Mounting Bolt Installation Download
ASB/SB N-137.1 18/06/1976 X X X Wire Modification - Wet/dry AG Kit P/N 269A4153, -3 or -5 Download
ASB/SB N-85.3 18/06/1976 X X X Installation - Adapter Mounted Idler Pulley Clutch Assembly Kit No. 269A5447 Download
ASB/SB N-135 23/07/1976 X X X Field Modification and Repair - Manually Operated Searchlight Installation P/N 269A4333-27, -29, -39 and 269A4335-1 Download
ASB/SB N-109.2 01/09/1976 X X X Inspection of Tailboom Support Strut Aluminum End Fittings, PN 269A2016-3 and 269A2016-5; Replacement of Aluminum End Fittings with Stainless Steel End Fittings (Modification Kit No. M10070) Download
ASB/SB N-140 01/09/1976 X X X Field Modification - Fuselage Frame Assembly Download
ASB/SB N-141.1 08/03/1977 X X X Field Modification and Interim Inspections - Belt Drive Clutch Linear Actuator Assembly Download
ASB/SB N-142.1 31/05/1977 X X X Initial Installation of PN 269A5194 Main Rotor Drive Ring Gear Carrier Assembly; Modification of PN 269A5182 Main Gear Drive Upper Housing Assembly Download
ASB/SB N-143 31/05/1977 X X X Periodic Inspection - P/N 269A5179-3 Driveshaft and Coupling Assembly, Main Rotor Gear Drive Assembly P/N 269A5175, -3 or -5 Download
ASB/SB N-117.2 11/07/1977 X X X Dual RPM and Quiet Operation Configuration P/N 269A4957-3 Download
ASB/SB N-145 11/07/1977 X X X Replacement of P/N 269A8244 or -7 Tailboom Clamp Assembly for Muffler/Resonator Kit P/N 269A8245-3 Download
ASB/SB N-144 08/08/1977 X X X Inspection - Throttle Control Cable Assembly Download
ASB/SB N-148 19/09/1977 X X X Inspection of Sump Cap Attach Hardware - Main and Auxiliary Fuel Tank Assemblies Download
ASB/SB N-82.3 19/09/1977 X X X Inspection - Tailboom Center Attach Fitting (PN 269A2324), and Center Frame Aft Cluster Fittings (PN 269A2234 and 269A2235) Download
ASB/SB N-9.2 03/10/1977 X X X Inspection - Possible Retirement Main Rotor Blade Download
ASB/SB N-149 28/12/1977 X X X Installation of Placard P/N 269A4646-191 Declutched Operation Prohibited Above 1600 RPM Download
ASB/SB N-150 15/07/1978 X X X Inspection and Possible Replacement Seat Belt and Shoulder Harness Assembly, P/N 269A4345 (American Safety Flight Systems P/N 500987-401) Download
ASB/SB N-154 25/09/1978 X X X Field Modification of New Four bolt Attachment Configuration - Tail Skid Tube, Tailboom Adapter and Transmission Housing Download
ASB/SB N-151.2 07/11/1978 X X X Inspection - Main Transmission Pinion Asseembly P/N 269A5103-9 Download
ASB/SB N-156 15/02/1979 X X X Field Repair or Removal - Trim Tab Main Rotor Blade P/N 269A1160 Series, 269A1185 Series and 269B1145 Series Download
ASB/SB N-157 10/05/1979 X X X Replacement of Radio Transmit/Intercom Trigger Switch; Rework of Cyclic Pitch Stick Grip Assembly Download
ASB/SB N-158 20/07/1979 X X X P/N 269A4546-5 Clutch Linear Actuator Assembly - Installation of Drain Hole in Actuator Cover Download
ASB/SB N-161 28/09/1979 X X X 100 Ampere Capacity Alternator Installation - Torque Inspection Of Pivot Bolts P/N AN7-12 and NAS1302-2 Download
ASB/SB N-162 12/10/1979 X X X Inspection of Tail Rotor Blade Assembly P/N 269A6035-21 and -23 Download
ASB/SB N-163 26/11/1979 X X X P/N 269A6050 Series and 269A1800-3 - Tail Rotor Pitch Control Assembly - Seating of Bearing Inner Race; Torque Increase for P/N 269A6258 Locknut Download
ASB/SB N-146.2 07/12/1979 X X X Belt Drive Transmission Asseembly Inspection of Lower Pulley Bearings and Shimming of Lower Pulley Bearing Straps; Periodic Torque Checks of Forward Bearing Retaining Nut Download
ASB/SB N-164 07/12/1979 X X X Inspection of P/N 269A5573-11 H-Frame Assembly Download
ASB/SB N-159.1 18/12/1979 X X X Field Installation of P/N 269A5160 Anti-Fretting Liner for P/N 269A5179-3 Driveshaft Coupling Assembly and P/N 269A5194 Ring Gear Carrier Assembly Download
ASB/SB N-166 17/03/1980 X X X Replacement of Seat Belt Assemblies having Fabric to Metal Latching Devices Download
ASB/SB N-167 11/07/1980 X X X Identification and Possible Rework of Seat Belt and Shoulder harness Assemblies Download
ASB/SB N-168 18/07/1980 X X X Rework of Pilot's Seat Cushion Assembly P/N 269A4039 Download
ASB/SB N-172 12/09/1980 X X X Installation of Transmission Chips Warning Light for P/N 269A6027 Tail Rotor Transmission Assembly Download
ASB/SB N-171 31/12/1980 X X X Periodic Check of Main Rotor Blade Elastomeric Damper Assemblies P/N 269A1290-1 Download
ASB/SB N-155.2 20/01/1981 X X X Replacement of P/N 269A6092 or 369A1602 Tail Rotor Drive Fork Hinge Bolt and P/N 269A6093 or 369A1603 Nut; New Assembly Procedure for Tail Rotor Hub and Drive Fork Unit; Periodic Check of Flapping Hinge Bolt Preload Download
ASB/SB N-173 30/01/1981 X X X Sealing of Interfaces of Abrasion Strip and Main Rotor Blade Skin Download
ASB/SB N-174 23/02/1981 X X X Inspection of P/N 269A5050-73 Thrust Bearing; MRC P/N 9210-UP2-2 S/N 539 thru 647 Download
ASB/SB N-177 15/04/1981 X X X Field Inspection and Repair of Tail Rotor Transmission Main Housing Assembly P/N 369A5401 Download
ASB/SB N-56.4 06/05/1981 X X X Inspection - Main Rotor Mast Download
ASB/SB N-160.1 12/08/1981 X X X Rework of Main Rotor Mast Assembly for Improved Corrosion Protection Download
ASB/SB N-153.1 28/10/1981 X X X Inspection and Rework of LTS Tail Rotor Hub P/N 369A1725, -5 and -501 Download
ASB/SB N-180 18/01/1982 X X X Engine Throttle Governor Kit Installation P/N 269A4995-301 Download
ASB/SB N-147.4 23/02/1982 X X X Relocation of Starter Vibrator Circuit Wiring Download
ASB/SB B-250 20/03/1982 X X X Triple-Latch Door - Lower Latch Bolt and Collective Friction Guide Assembly Interference Download
ASB/SB B-251 20/03/1982 X X X Inspection of Clutch Cable Assembly and Termal End (P/N AN669L3RH or MS21260L3RH) Download
ASB/SB N-181 09/04/1982 X X X Inspection, Replacement and New Torque Requirement - P/N 269A5104 Main Transmission Ring Gear, P/N 269A5194 Ring Gear Carrier Assembly and Attach Hardware Download
ASB/SB N-178.1 19/04/1982 X X X Instrument Cluster 3-Pack Conversion - AC to Rochester (28 volt) Download
ASB/SB N-182 26/05/1982 X X X Periodic Inspection of Idler Pulley Support Bracket Assembly, PN 269A5575 and PN 269A5575-3 Download
ASB/SB B-252 01/06/1982 X X X Precision Airmotive Corporation Bulletins PRS-97 and PRS-98 Download
ASB/SB N-179.1 17/08/1982 X X X Inspection and Retirement - PN 269A5179 and 269A5179-3 Drive Shaft and Coupling Assembly, Main Rotor Gear Drive Assembly PN 269A5175 Basic, -3 or -5 Download
ASB/SB N-185 12/10/1982 X X X Operational Check - Fuel Low Warning System Download
ASB/SB N-186 15/03/1983 X X X Corrosion Inspection - Transmission Oil Pressure Switch P/N 269A4576 Download
ASB/SB N-187 29/07/1983 X X X Inspection and Overhaul of Fuel Shutoff Valve P/N 269A4598 Download
ASB/SB N-184.1 21/11/1983 X X X Periodic Check and Initial Replacement - Belt Drive Pulley H-Frame Tie Bar Bracket Assembly, PN 269A5517-7 Download
ASB/SB N-190 15/12/1983 X X X Bungee Installation Kit P/N M10123 - Collective Pitch Stick Download
ASB/SB N-192 07/05/1984 X X X One-time Inspection of main Rotor Hubs and Shafts; P/N 269A5305 and -9 Download
ASB/SB N-193 09/01/1985 X X X Installation - P/N 269A5192 Pinion Aft Bearing Oil Strainer Assembly in Main Transmission Assemblies Built Prior to 1969 Download
ASB/SB N-194 09/01/1985 X X X One-time Inspection and Rework of P/N 269A4262 Inertia Reel Shoulder Harness Assemblies and Installation Download
ASB/SB N-111.3 24/01/1986 X X X Conversion of 12V to 24V Electrical System - Modification Kit No. M10068 and Installation of 24V, 100 Ampere Capacity Alternator - Kit No. 269A4929-1 Download
ASB/SB N-169.1 28/02/1986 X X X alternator Out Indicating Light Download
ASB/SB N-195 28/02/1986 X X X Inspection of Main Transmission Assembly, P/N 269A5175-11, -13, -15 and -17 Download
ASB/SB N-196 28/02/1986 X X X Inspection of Throttle and Governor Control Cable Assemblies Download
ASB/SB N-198 28/02/1986 X X X Inspection and Rework of Tail Rotor Pitch Control Link Assembly, P/N 269A6091-5 and 369A1807-7 Download
ASB/SB N-205 22/08/1986 X X X Identification and Possible Replacement of Radio Communication Relay Download
ASB/SB N-189.1 02/09/1986 X X X Main Rotor Damper Pitch Bearing Case Attach Hole Inspection and Spacer (PN 269A1207) Installation Download
ASB/SB N-207 10/11/1986 X X X Installation and Replacement of Protective Sleeve (Speedi-Sleeve PN 084956) on Tail Rotor Transmission Output Gearshaft Download
ASB/SB N-203 19/11/1986 X X X Visual Check to Ensure that Proper Thrust Bearing Tube is Installed Download
ASB/SB N-208 19/11/1986 X X X Identification and Possible Replacement of Tail Rotor Fork Bolt Download
ASB/SB N-202 23/02/1987 X X X Improved Methods for Checking Idle Mixture and Idle Speed. Operational Check of Fuel System. Download
ASB/SB N-201.1 23/03/1987 X X X Inspection and Sealing of Main Rotor Blade Elastomeric Dampers Download
ASB/SB N-176.2 25/03/1987 X X X Installation of Main Rotor Blade Elastomeric Damper Assemblies P/N 269A1290-1 Download
ASB/SB N-200 30/03/1987 X X X One-time Inspection of Bolt Holes at Tail Rotor Transmission Attachment Area Download
ASB/SB N-175.1 09/04/1987 X X X Installation of PN 269A5593-3 H-Frame with PN 269A5050-78 Bearings Download
ASB/SB N-209 09/04/1987 X X X One-Time Inspection of Belt Drive Upper Pulley Assembly Download
ASB/SB N-206 17/04/1987 X X X United Instruments, Inc. Altimeters (SZR Part No. 369H4505) Download
ASB/SB N-204 16/06/1987 X X X Identification and possible Replacement of Collective Pitch Mixer Bellcrank Download
ASB/SB N-199.1 15/07/1987 X X X One-time Inspection of Main Rotor Driveshaft P/N 269A5304-5 Download
ASB/SB N-213 29/09/1987 X X X Daily Visual Inspection of Droop Stop Nut; One-time Dye Penetrant Inspection of Droop Stop Nut P/N 269A1340 Download
ASB/SB N-211 03/11/1987 X X X Periodic Inspection of Engine Lower Coupling Driveshaft Boot P/N 269A5473 Download
ASB/SB N-214 03/11/1987 X X X Reduced Service Lives for P/N 269A6065 and 369A1706 Tail Rotor Retention Strap Assemblies Download
ASB/SB N-216 03/11/1987 X X X Magnetic Particle Inspection of Main Transmission Pinion Assembly Download
ASB/SB N-218 22/01/1988 X X X Replacement of Auxiliary Fuel Quantity Placard; Installation of P/N 269A4106-3 Instrument Cluster as Replacment for P/N 269A4106 Instrument Cluster Download
ASB/SB N-217 29/01/1988 X X X Identification of Center Frame Aft Cluster Fittings; Installation of P/N 269A4646-19 Support Strut Placards Download
ASB/SB N-220 29/01/1988 X X X One-time Inspection of P/N 269A2234-3 and 269A2235-3 Aft Cluster Fittings Download
ASB/SB N-221 29/01/1988 X X X Return of Cluster Fittings in Spares Inventory; Dye Penetrant Inspection and Removal of Sample Piece from Aft Cluster Fittings; Daily Visual Inspection of Aft Cluster Fittings Download
ASB/SB N-212 10/03/1988 X X X One-time X-ray Inspection of Tail Rotor Blade Spar P/N 269A6035-21 and -23 Download
ASB/SB N-215 21/09/1988 X X X Update of Model 269B and 269C Pilot's Flight Manual; Installation of 269A9928-5 and 269A9928-7 Center Cover Support Bracket Download
ASB/SB N-222 21/09/1988 X X X Textron Lycoming Service Bulletins: No. 480 Oil and Filter Change and Cleaning No. 369G Engine Inspection after Overspeed or Overboost Download
ASB/SB N-224 21/09/1988 X X X Inspection and Possible Replacement of P/N 33-199-915 Fuel Filter Element (Wire Mesh Screen without Stiffeners) Download
ASB/SB N-231 31/05/1989 X X X Identification and Possible Repair of Precision Airmotive Fuel Injector Model RSA-7AA1, Precision Airmotive Service Bulletin PRS-92 Download
ASB/SB N-134.3 03/07/1989 X X X Revised Engine Operating Procedures and Maintenance Practices Download
ASB/SB N-226 03/07/1989 X X X Identification of Belt Drive Clutch Spring Assembly, Inspection of Belt Drive Clutch Engagement Cable, Field Retrofit of 269A5483-1 and 269A5483-3 Belt Drive Clutch Spring Assemblies with New Cable Sub-Assembly Download
ASB/SB N-227 03/07/1989 X X X Inspection of Main Rotor Pitch Bearing Snap Ring Lockwasher Download
ASB/SB N-183-3 15/09/1989 X X X Pilot Preflight Check of Tail Rotor Blade Leading Edge Abrasion StripDetailed Inspection of Tail Rotor Blade Leading Edge Abrasion Strip Bonding Installation of Rivets on Tail Rotor Blade Leading Edge Abrasion Strip Download
ASB/SB N-232 06/10/1989 X X X Inspection of Tail Rotor Driveshaft Damper block Assembly P/N 269A2330-3 Download
ASB/SB N-219 24/08/1990 X X X Detail Inspections of Upper Pulley Stack-up Download
ASB/SB B-237.1 30/05/1991 X X X Possible Restriction of Cyclic Pitch Control Download
ASB/SB N-210.1 30/05/1991 X X X Identification of Throttle Cable Assemblies; Inspection of P/N 269A4683(BSC) or -3 Throttle Cable Assemblies having Threaded End Fittings; Replacement of P/N 269A4683(BSC) or -3 Throttle Cable Assemblies having Threaded and/or Aluminum End Fitting Download
ASB/SB B-236 04/09/1991 X X X Inspection of Low Tip Speed Tail Rotor Swashplate Bellcrank Assembly Hole Download
ASB/SB B-238.1 07/11/1991 X X X Inspection and Retirement of 269A2324(BSC) and -7 Tailboom Center Attachment Fittings Download
ASB/SB B-239.1 07/11/1991 X X X Inspection and Retirement of 269A2324-7 Tailboom Center Attachment Fitting Download
ASB/SB B-248 07/11/1991 X X X Bendix Fuel Injector System Model RSA-7AA1, P/L 2524347 (Lycoming P/N 77885) and Precision Airmotive Corporation Service Bulletin PRS-94 and PRS-94 Suppl 1 Download
ASB/SB B-234 16/12/1991 X X X Inspection and Modification of Longitudinal Trim Mounting Plate and Trim Arm Stop Download
ASB/SB B-233 10/02/1992 X X X One Time Inspection - Engine Oil Cooler Download
ASB/SB B-241 10/02/1992 X X X Inspection of Seat Belt Snap Hook End Fittings Download
ASB/SB B-242 10/02/1992 X X X One Time Inspection of Main Rotor Blades Download
ASB/SB N-229.1 10/02/1992 X X X Part Number Conversion of 369 Series Part Numbers to 269 Series Part Numbers that are Used on 269 Series Helicopters Download
ASB/SB B-235.1 20/03/1992 X X X Possible Restriction of Throttle Controls Download
ASB/SB B-249 20/03/1992 X X X One Time Inspection of Throttle Override Bellcrank Assembly Download
ASB/SB B-240 08/05/1992 X X X one Time Inspection - Thrust Bearing Nut P/N 269A1315 with Possible Incomplete Threads Download
ASB/SB B-243 08/05/1992 X X X Corrosion Damage Inspection of Main Rotor Driveshaft P/N 269A5305 Download
ASB/SB B-245 08/05/1992 X X X Maintenance and Operation Requirements for Safe Operation of Surplus TH-55A Helicopters Download
ASB/SB B-247 30/10/1992 X X X Tail Rotor Pedal Bulkhead (Floor Beam) Gusset Download
ASB/SB B-255.1 01/02/1993 X X X Main Rotor Driveshaft Inspection Download
ASB/SB B-257.1 21/05/1993 X X X One-Time Inspection of Lower Coupling Driveshafts, and New Engine/Rotor Tachometer Markings Download
ASB/SB B-256.2 11/06/1993 X X X Inspection of Clutch Control Spring Assembly Installation Download
ASB/SB B-253 03/09/1993 X X X Tailboom Support Struts Corrosion Inspection Download
ASB/SB B-260 19/10/1994 X X X Corrosion Inspection and Treatment of Lower Coupling Drive Shaft Download
ASB/SB B-261 19/10/1994 X X X Periodic Inspection of Main Transmission Pinion Input Shaft Assembly Download
ASB/SB B-263 24/05/1995 X X X Inspection of Aft Cluster Fittings Download
ASB/SB DB-003 29/01/1997 X One-Time Inspection of Tail Rotor Blades Download
ASB/SB B-259.2 02/11/1998 X X X 50-Hour Inspection of Main Rotor Blade Abrasion Strip Download
ASB/SB B-265.1 23/07/1996 X X X 269A6050-005 LTS Tail Rotor Pitch Control Assembly, Torque Verification of 269A6258 Nut, and Application of Torque Stripes Download
ASB/SB DB-002.1 23/07/1996 X 269A6050-005 Tail Rotor Pitch Control Assembly, Torque Verification of 269A6258 Nut, and Application Of Torque Stripes Download
ASB/SB B-266 15/10/1996 X X X Textron Lycoming Service Bulletin No. 525 Download
ASB/SB C1B-004 24/07/1997 X Textron Lycoming Service Bulletin No. 527C Download
ASB/SB C1B-006 20/03/1998 X Inspection of Main Transmission Pinion Splines; New Torque Check Requirement for Aft Pinion Nut Download
ASB/SB B-244.3 06/04/1998 X X X Possible Deterioration of Certain Main Transmission Pinion Assembly Teeth and Ring Gear Teeth Download
ASB/SB C1B-007 14/07/1998 X One-Time Inspection of Main Rotor Hub and Shaft, and New Assembly Procedure Download
ASB/SB C1B-005.1 14/07/1998 X Primer Hose Replacement Download
ASB/SB DB-005 24/07/1998 X Replacement of Main Rotor Hub Hoisting Eye Download
ASB/SB DB-004.3 03/11/1998 X Main Rotor Hub and Shaft Inspection and New Assembly Procedure Download
ASB/SB N-188.4 12/02/1999 X X X Installation of New Higher Strength Tail Rotor Blade Retention Bolt P/N LWB22-6-22, LWB22D-6-22 or HS4441-6-22; and Inspection of Tail Rotor Blade Attachment Bushing Holes Download
ASB/SB DB-007.1 14/10/1999 X Tail Rotor Swashplate Shaft Inspection Download
ASB/SB DB-008 18/02/2000 X Inspection/Replacement Criteria for Certain Upper H-Frame Bearings (Schweizer P/N 269A5050-78) Download
ASB/SB B-273 23/08/2000 X X X Replacement of Shoulder Harness and Inertia Reel Assembly Download
ASB/SB B-274 02/01/2001 X X X Textron Lycoming Special Advisory No. 63-1200 Download
ASB/SB C1B-011 02/01/2001 X Textron Lycoming Special Advisory No. 62-1200 Download
ASB/SB B-270.2 12/03/2001 X X X Inspection of 269A5104-007 Main Transmission Ring Gears with Specific Serial Numbers and Reporting of Inspection Results Download
ASB/SB DB-006.1 08/01/2001 X Inspection of 269A5104-007 Main Transmission Ring Gears with Specific Serial Numbers and Reporting Inspection Results Download
ASB/SB C1B-012 12/03/2001 X One-Time Inspection for Condition and Modification of Certain Idler Pulley Support Assemblies Download
ASB/SB DB-009 28/09/2001 X Replacement of Forward and Aft Kaflex Drive Shaft Coupling Bolts Download
ASB/SB C1B-013.1 14/11/2001 X Main Rotor Swashplate Bearings P/N 269A1301 Download
ASB/SB B-277 25/01/2002 X X X One-Time Inspection of Certain 269A2234-3 (LH) and 269A2235-3 (RH) Aft Cluster Fittings Download
ASB/SB DB-013 26/04/2005 X Fuel Pump Drain Tube Download
ASB/SB DB-014.2 19/04/2006 X Modification of Locknut/Hoist Eye Assembly Download
ASB/SB DB-015.1 19/04/2006 X Modification of CEF 8618M33 Linear Actuator Download
ASB/SB B-284.1 18/09/2006 X X X Modification of 269A4564-5 and -7 Linear Actuators Download
ASB/SB C1B-014 09/08/2002 X One-time Inspection of 269A2172-5 Aft Mast Support Tube Forward Fitting Download
ASB/SB B-278 06/09/2002 X X X 269A2234 BSC and 269A2235 BSC Aft Cluster Fitting Modification Download
ASB/SB B-269.1 26/12/2002 X X X Replacement of Old Style Tail Rotor Drive Fork Hinge Bolt and Clarification of Torque Value Download
ASB/SB DB-011.1 20/03/2003 X Horizontal Stabilizer, Inspection of End Plate and Attachment Download
ASB/SB N-121.2 10/04/2003 X X X Inspection and Rework Tail Rotor Control System, Rudder Pedal Installation Download
ASB/SB B-281 05/09/2003 X X X Throttle Governor Bellcrank Download
ASB/SB C1B-015 04/11/2003 X Modification of 269A5590-1 Clutch Spring Assembly Download
ASB/SB B-280.1 06/04/2004 X X X Modification of 269A5590-1, and 269A5483-1/-3 Clutch Spring Assemblies Download
ASB/SB B-282.1 24/09/2004 X X X Support Bracket (269A8460-3) Throttle Bellcrank, Inspection for Cracks Download
ASB/SB C1B-016.1 24/09/2004 X Support Bracket (269A8460-1) Throttle Bellcrank, Inspection for Cracks Download
ASB/SB C1B-017.1 04/03/2005 X Inspection and Modification of 269A7316-13 Lateral Control Trim Assembly Download
ASB/SB C1B-019.1 29/01/2007 X Tail Rotor Swashplate Bellcrank Assembly Safety Washer Installation Download
ASB/SB DB-017 13/11/2006 X Installation of Latch Assy. Fuel Cell Cover Kit Download
ASB/SB C1B-020 29/11/2006 X Slick Service Bulletin SB1-06A Download
ASB/SB DB-021 24/10/2007 X Restrictions in Rolls-Royce Turbine Engine Operation Download
ASB/SB DB-020 01/11/2007 X Alignment Inspection - KAFLEX Shaft to Engine Output Shaft Download
ASB/SB DB-022 12/11/2007 X Inspection of Tail Rotor Pedal Attachment Structure and Installation of Tail Rotor Pedal Attachment Reinforcement Kit Download
ASB/SB DB-018.3 13/12/2007 X Inspection for Fatigue Cracking in 269D3300-1 Aft Fuselage Assemblies and Installation of Stabilizer Mount Doublers Download
ASB/SB DB-023.1 21/04/2008 X Tail Rotor Drive Shaft Splined Fittings Inspection Download
ASB/SB C1B-023 28/04/2008 X Reprint of Precision Airmotive Mandatory Service Bulletin Download
ASB/SB DB-024.1 26/09/2008 X Installation of Single Wheel Ground Handling Wheel Locking Device Download
ASB/SB DB-025 26/09/2008 X Landing Gear Skid Tube Aft Sleeve Inspection Download
ASB/SB C1B-027 03/10/2008 X Fuel Strainer Leak Check Download
ASB/SB DB-026 08/12/2008 X Modification of Cabin Door Hinges Download
ASB/SB C1B-024.1 24/11/2008 X Throttle Control Restriction Download
ASB/SB C1B-029 09/01/2009 X Incorrect Grease Identification in Certain Serial Number Helicopters Download
ASB/SB DB-029 13/02/2009 X Longitudinal Trim Assembly Spring Attachment Download
ASB/SB DB-027.2 01/09/2009 X Inspection of Engine-Transmission Oil Cooler Impeller Download
ASB/SB DB-031 01/09/2009 X Oil Cooler Impeller Blade Containment Kit Download
ASB/SB DB-019.1 24/08/2010 X Main Transmission Input Pinion Corrosion Protection Download
ASB/SB B-294 24/08/2010 X X X Incorrect Bushing used in 269C Flight Controls Download
ASB/SB C1B-030 24/08/2010 X Center Control Cover Contacting Lateral Cyclic Control Rod Download
ASB/SB C1B-031 24/08/2010 X Incorrect Bushing used in 269C-1 Flight Controls Download
ASB/SB C1B-033 05/01/2011 X Clevis Pin Chaffing Bottom of Fuel Tank Download
ASB/SB DB-034 09/05/2011 X 269D1120 Main Rotor Blade Paint Separation Download
ASB/SB DB-037.1 13/12/2011 X Inspection of Main Rotor Drive Thrust Bearing Journal Radius Download
ASB/SB C1B-035 04/01/2012 X POWERTRAIN: One-Time Inspection of Belt Drive Idler Pulley Hardware for Presence and_x000D_Security Download
ASB/SB DB-041.1 24/02/2012 X DRIVE TRAIN - Tail Rotor Drive Shaft Splined Fittings ? Perform a One-Time Inspection and_x000D_ Implement a Recurring Inspection for Wear Download
ASB/SB B-295.1 28/02/2012 X X X Inspection and Modification of Tail Boom Support Strut Adjustable Diameter Bolt Download
ASB/SB C1B-032.1 28/02/2012 X Inspection and Modification of Tailboom Support Strut Adjustable Diameter Bolt Download
ASB/SB B-300 18/04/2012 X X X One-Time Inspection to Remove from Service Engine and/or Rotor Tachometer Cables with_x000D_a Hexagonal Connector on One End. Download
ASB/SB C1B-037 18/04/2012 X One-Time Inspection to Remove from Service Engine and/or Rotor Tachometer Cables with_x000D_a Hexagonal Connector on One End Download
ASB/SB DB-043 26/04/2012 X ENGINE INSTALLATION ? Engine Alignment Adjustment ? Implement Recurring Engine_x000D_Alignment Checks Download
ASB/SB DB-040A 04/12/2012 X POWER TRAIN ? Ring Gear Carrier Assembly ? To Implement a Reduction in Service Life Download
ASB/SB DB-050 02/05/2013 X One-Time Tail Rotor (T/R) Blade Borescope Inspection for Excess Primer Download
ASB/SB C1B-039 02/05/2013 X One-Time Tail Rotor (T/R) Blade Borescope Inspection for Excess Primer_x000D_ Download
ASB/SB DB-044 25/07/2013 X X X X X One-Time Engine Alignment Check and Inspection of the KAflex? Drive Shaft, KAflex Coupling Assembly, and Engine Mount Assembly Absorbers Download
ASB/SB DB-046 13/08/2013 X X X One-Time Visual Inspection of Main Rotor (M/R) Blade Assemblies and Implement a Recurring Visual Inspection for Cracks Download
ASB/SB DB-052 16/01/2014 X X Reduction in service life of KAflex? Drive Shaft and Coupling Assembly (269D Configuration "A") and (269D). Implement a new 1200 Hour Overhaul Inspection of the KAflex Drive Shaft and Coupling Assembly Download
ASB/SB DB-054 01/04/2014 X X KAflex Drive Shaft and Coupling Assembly Service Life Expiration Download
ASB/SB DB-057 15/04/2014 X X X X X X One-Time Load/Stroke Inspection of Landing Gear Dampers to be Performed at an Overhaul or Repair Facility Download
ASB/SB DB-060 21/11/2014 X X One-Time Inspection of Tail Rotor Flight Control Cables, Pulleys, and Forward and Aft Bellcranks for Damage and/or Wear, and Verification of Parts Configuration Download
ASB/SB C1B-043A 18/12/2014 X POWER TRAIN - Lower Coupling Drive Shaft - One-Time Inspection of Lower Coupling Drive Shaft and Shaft Assembly Download
ASB/SB B-308A 04/08/2015 X X X MAIN ROTOR AND CONTROL SYSTEM - Pilot's Collective Pitch Control Stick - One-Time Inspection of Collective Pitch Control Torque Tube Download
ASB/SB C1B-040 30/06/2015 X POWER TRAIN - Belt Drive Transmission Assembly - One-Time Inspection of the Belt Drive Transmission Upper Pulley Installation for Correct Torque, Parts Configuration and Stack-up, Damage and/or Wear Download
ASB/SB B-305 30/06/2015 X X X POWER TRAIN - Belt Drive Transmission Assembly - One-Time Inspection of the Belt Drive Transmission Upper Pulley Installation for Aft Pinion Nut Torque, Parts Configuration and Stack-up, Damage and/or Wear Download
ASB/SB DB-058 30/06/2015 X X POWER TRAIN SYSTEM - Belt Drive Transmission Assembly - One-Time Inspection of the Belt Drive Transmission Upper Pulley Installation for Aft Pinion Nut Torque, Parts Configuration and Stack-up, Damage and/or Wear Download
ASB/SB B-307A 26/08/2015 X X X POWER TRAIN – Lower Coupling Drive Shaft – One-Time Inspection of Lower Coupling Drive Shaft and Shaft Assembly Download
ASB/SB C1B-045 29/02/2016 X POWER TRAIN – Belt Drive Clutch Control Installation – One-Time Inspection of Cable Pulley Bracket Download
ASB/SB DB-062 03/03/2016 X X MAIN ROTOR AND CONTROL SYSTEM AND TAIL ROTOR AND CONTROL SYSTEM – Main Rotor and Tail Rotor Control Rods – One-time Inspection of Flight Control Pushrods with Adjustable Rod Ends Download
ASB/SB DB-064 06/05/2016 X X POWER TRAIN SYSTEM – KAflex® Driveshaft – KAflex Driveshaft Reduction in Service Life Download
ASB/SB B-311 30/06/2016 X X X CABIN AND CENTER FRAME SECTION-Cabin Doors - One-time Inspection of Airframe and Door Mounted Hinge Halves for Proper Sizing and Plunger Pin to Lug Engagement Download
ASB/SB C1B-047 30/06/2016 X X X X X X CABIN AND CENTER FRAME SECTION-Cabin Doors-One-time Inspection of Airframe and Door Mounted Hinge-Halves for Proper Sizing and Plunger Pin to Lug Engagement Download
ASB/SB DB-066 30/06/2016 X X CABIN AND CENTER FRAME SECTION – Cabin Doors – One-time Inspection of Airframe and Door Mounted Hinge-Halves for Proper Sizing and Plunger Pin to Lug Engagement Download
ASB/SB DB-070 16/03/2017 X X POWER TRAIN SYSTEM – KAflex® Driveshaft – One-Time Inspection of KAflex® Assemblies for Axial Play and Installation of Bolt (NAS6605-25) Download
ASB/SB DB-068 17/03/2017 X X ENGINE CONTROL SYSTEM – Adjustment of Power Controls – Revise N2 Restrictions for Rolls-Royce® Turbine Engine Operation and Installation of Engine N2 Avoidance Placard Download
ASB/SB DB-072 03/10/2017 X X POWER TRAIN SYSTEM – Kaflex® Drive Shaft – One-Time Inspection for the Correct Bolt that Attaches the Drive Adapter to KAflex® Assembly Download
ASB/SB DB-040A MASTER 04/12/2012 X X X ALERT SERVICE BULLETIN NO. DB-040A – POWER TRAIN – Ring Gear Carrier Assembly – To Implement a Reduction in Service Life Download
ASB/SB DB-001-1 28/09/1995 X X X 50-Hour Inspection Of Main Rotor Blade Ambrasion Strip Download
ASB/SB DB-035 09/05/2021 X X X 269D1120 Main Rotor Blade Paint Separation Download
ASB/SB DB-037.1 12/12/2011 X X X SERVICE BULLETIN No. DB-037.1 - Inspection of Main Rotor Drive Thrust Bearing Journal Radius Download
ASB/SB DB-038.1 12/12/2011 X X X SERVICE BULLETIN No. DB-038.1 - Inspection of Main Rotor Drive Thrust Bearing Journal Radius Download
ASB/SB DB-039 04/01/2012 X X X POWERTRAIN: One-Time Inspection of Belt Drive Idler Pulley Hardware for Presence and Security Download
ASB/SB DB-041 12/02/2024 X X X ALERT SERVICE BULLETIN No. DB-041.1 - Tail Rotor Drive Shaft Splined Fittings – Perform a One-Time Inspection and Implement a Recurring Inspection for Wear. Download
ASB/SB DB-042 13/02/2024 X X X DRIVE TRAIN - Tail Rotor Drive Shaft Splined Fittings – Perform a One-Time Inspection and Implement a Recurring Inspection for Wear Download
ASB/SB DB-045 25/07/2013 X X X One-Time Engine Alignment Check and Inspection of the KAflex® Drive Shaft, KAflex Coupling Assembly, and Engine Mount Assembly Absorbers Download
ASB/SB DB-055 14/12/2015 X X X Download
ASB/SB DB-056 15/04/2014 X X X One-Time Load/Stroke Inspection of Landing Gear Dampers to be Performed at an Overhaul or Repair Facility Download
ASB/SB DB-059 30/06/2015 X X X POWER TRAIN SYSTEM – Belt Drive Transmission Assembly – One-Time Inspection of the Belt Drive Transmission Upper Pulley Installation for Aft Pinion Nut Torque, Parts Configuration and Stack-up, Damage and/or Wear Download